Skip to content

2026-08-28

Trason and Trey finished the first iteration of the RVTM. Trason also worked on the components of the drone and the drone diagram. Lachlan finished the OV-1 and worked on Cube controller and program research. Sean put together the overall system diagram and layout. Trey and Duke built and validated the target transmitter, Duke is developing the KrakenSDR to output a MAVLink packet to the Cube controller, and the team helped identify the uses and function of existing equipment.

As a group we started working on routing KrakenSDR traffic into the Cube controller — we've successfully routed traffic to a PC for now. Next is figuring out the interconnection between the Krakens and the Cube so it can be transmitted over MAVLink, along with learning Mission Planner and how it's used to program the Cube.